HVAC Improvements at Terminal 1 Bridge Rotunda Harry Reid Intl Airport
Owner:
Clark County Department of Aviation
Contact Name:
Kevin Deines
Contact Phone:
Contact Email:
Architect:
Ali Javan
Turpin & Rattan Engineering, Inc.
Start Date:
November 2021
Completion Date:
July 2022
Project Description
The scope of this project included the demolition four Air Handling Units. Existing Variable Air Volume (VAV) boxes downstream of AHU-BR-09 will be replaced and new ductwork was required. A new exterior roll-up door and stairs will be added for maintenance access. The existing Motor Control Center (MCC) was demolished, and all circuits were moved over to another MCC (MCC-A).
Project Evaluation:
$2,633,749.05