Additional Jobs

Freedom Meats

This 26,623 Square foot cold storage and office building was built on the same footprint as an existing building which ran without a loss of 1 productive day. The project complexity required 3 phases. During phase 1 the new facility is being built over the top of the original, which was demolished from inside the new. The project total exceeds $4.2M.

Solid State Electric Office Building

This is a 17,598 square feet commercial office/ warehouse building. The estimated budget for this project is $3M.

Nevada State College Student Services Building

Nevada State College procured a building with state funding which Monument built at a budget of 25% of new construction costs. The project area is 2.44 Acres. This is a fast-tracked project since it must be ready before the start of the next fall semester. The estimated budget for this project is currently $1.5M.

University of Nevada, Las Vegas – Lied Library

This is a Nevada Public Works division project. The project area is around 5,000 square feet and the current estimated budget for this project is $1M. This project works right in the heart of the university and being a library project, it has high end acoustical and soundproof elements in it. The demands and sophistication of owner/client coordination is top level and requires skills of a degreed candidate to match up to the knowledge of the architects and the clients. A formal 2–3 hour progress meeting every other Wednesday is one of their requirements which includes preparing meeting minutes.

Spring Mountain Youth Camp, Mount Charleston, Nevada

This youth detention facility includes 5 buildings and 30,000 square feet. Located 52 miles from Las Vegas at a mountain youth detention center, this project requires extra security measures, background checks and rigorous coordination. The estimated budget for this project is at $1M.

Well Care Pharmacy at Charleston

This pharmacy complex is being built in 2 phases – 3300 West Charleston and 3312 West Charleston. This project is spread over 13,000 square feet and its estimated budget is $2.5M

PAST PROJECTS

WETLANDS PARK: OUTDOOR EDUCATION AND NATURE CONNECTION CENTER 

OWNER

Owner: Clark County School District Architect: Southwick Landscape Architects Start Date: July 2021 Completion Date: January 2022 Project Description the work consists of but not limited to selective demolition of existing site as described in the drawings and specifications, to construct and install an approximate 1­acre nature themed park and signage for the existing WETLANDS PARK NATURE PRESERVE.

Spring Mountain Youth Camp-Football Field Synthetic Turf Replacement

OWNER

Spring Mountain Youth Camp-Football Field Synthetic Turf Replacement

K1 Speed

OWNER

Owner: David and Susan Danglard Architect: Client Provided Start Date: April 2024 Completion Date: August 2025 Project Description Local racing venue expanded their facilities and added a second track in the adjacent building. The work proceeded quickly, but the permitting and final approval process was delayed due to the age of the existing building’s fire… Continue reading K1 Speed

Esmeralda Building TI – Building 20

OWNER

Owner: State Public Works Division Architect: Carpenter Sellers Del Gatto Architects Start Date: December 2024 Completion Date: February 2025 Project Description Scope of work includes demolition of 4 rooms and it’s finishes, 8 new office additions, carpet and lighting replacement, ceiling replacement, HVAC & plumbing upgrades.  This project had a demand of a 90 days… Continue reading Esmeralda Building TI – Building 20

GSE EV CHARGING STATIONS

OWNER

Owner: Clark County Department of Aviation Architect: WRIGHT Structural Engineers Start Date: August 26, 2024 Completion Date: In Progress Project Description This project is located at Harry Reid International Airport and includes the installation of 24 dual port charging stations for Ground Support Electric Vehicles at Harry Reid International Airport D-Gates for Delta Airlines. 

Pecos Bonanza Campus Family Court Improvements

OWNER

Owner: Clark County Real Property Management Architect: IZ Design Studio Start Date: July 2020 Completion Date: September 2020 Project Description Provide labor, equipment, materials, and necessary permits required to: remove and replace all existing restroom and breakroom faucets, water closet/urinal flush devices, soap dispensers, water fountains, and replace with sensor operated fixtures per attached quote.

Signature Flight Hanger Demolition

OWNER

Owner:  Signature Aviation Architect: PGAL Start Date: April 2023 Completion Date: November 2023 Project Description Demolition – Existing T Hangars and Hangar Bravo: Demolition of the three (3) existing hangars (i.e. T1, T2 and Bravo Hangars).  Includes the removal of the existing bollards to grade level. Due to the depth of the bollard foundations the removal… Continue reading Signature Flight Hanger Demolition

Optimal Therapy Lake Mead

OWNER

Owner: Optimal Therapy Architect: Atwood Design Start Date: February 2023 Completion Date: May 2023 Project Description Perform demolition and tenant improvement at an existing one story office building.

RTC Hydrogen Fueling

OWNER

Owner: Regional Transportation Commission of Southern Nevada Architect: Clean Energy Start Date: September 2023 Completion Date: In Progress Project Description A complete mobile fueling system to support the operation of up to 15 hydrogen fuel cell electric buses at the Sunset Maintenance Facility (SMF). The mobile fueling system is intended to be used as an… Continue reading RTC Hydrogen Fueling