Eastside Probation – 4475 South Pecos, Renovation and Tenant Improvement

Owner:

Clark County Real Property Management

Architect:

Simona Stephens
Suzana Rutar Architect

Start Date:

April 2019

Completion Date:

October 2019

Project Description

Site work includes partial removal and replacement of concrete sidewalk on the adjacent property, partial removal and replacement of the valley gutter, installation of several truncated domes, curb ramp at drive cut, and restriping of path of travel markings in drive lane. Selective demolition including but not limited to casework, carpet, industrial filing cabinets, and roof assemblies. Removal and reinstallation of select doors. Infill of walls to match existing walls, new security measures such as electronic door hardware, store from window system with bullet resistive film. Installation of bullet resistive panels in main reception area. New PVC roofing system and warranties. New doors and hardware, ACT ceiling and grid in a portion of the building, and new painting throughout the space. Remove and replace existing signage on the building, including all associated permitting related to the signage scope as well as painting and adding new signage to the monument sign. Select mechanical work as it relates to removing existing HVAC units and replacing new roof top units. Retrofits of existing lighting fixtures and re-lamping of select fixtures.

 

PAST PROJECTS

WETLANDS PARK: OUTDOOR EDUCATION AND NATURE CONNECTION CENTER 

OWNER

Owner: Clark County School District Architect: Southwick Landscape Architects Start Date: July 2021 Completion Date: January 2022 Project Description the work consists of but not limited to selective demolition of existing site as described in the drawings and specifications, to construct and install an approximate 1­acre nature themed park and signage for the existing WETLANDS PARK NATURE PRESERVE.

Spring Mountain Youth Camp-Football Field Synthetic Turf Replacement

OWNER

Spring Mountain Youth Camp-Football Field Synthetic Turf Replacement

K1 Speed

OWNER

Owner: David and Susan Danglard Architect: Client Provided Start Date: April 2024 Completion Date: August 2025 Project Description Local racing venue expanded their facilities and added a second track in the adjacent building. The work proceeded quickly, but the permitting and final approval process was delayed due to the age of the existing building’s fire… Continue reading K1 Speed

Esmeralda Building TI – Building 20

OWNER

Owner: State Public Works Division Architect: Carpenter Sellers Del Gatto Architects Start Date: December 2024 Completion Date: February 2025 Project Description Scope of work includes demolition of 4 rooms and it’s finishes, 8 new office additions, carpet and lighting replacement, ceiling replacement, HVAC & plumbing upgrades.  This project had a demand of a 90 days… Continue reading Esmeralda Building TI – Building 20

GSE EV CHARGING STATIONS

OWNER

Owner: Clark County Department of Aviation Architect: WRIGHT Structural Engineers Start Date: August 26, 2024 Completion Date: In Progress Project Description This project is located at Harry Reid International Airport and includes the installation of 24 dual port charging stations for Ground Support Electric Vehicles at Harry Reid International Airport D-Gates for Delta Airlines. 

Pecos Bonanza Campus Family Court Improvements

OWNER

Owner: Clark County Real Property Management Architect: IZ Design Studio Start Date: July 2020 Completion Date: September 2020 Project Description Provide labor, equipment, materials, and necessary permits required to: remove and replace all existing restroom and breakroom faucets, water closet/urinal flush devices, soap dispensers, water fountains, and replace with sensor operated fixtures per attached quote.

Signature Flight Hanger Demolition

OWNER

Owner:  Signature Aviation Architect: PGAL Start Date: April 2023 Completion Date: November 2023 Project Description Demolition – Existing T Hangars and Hangar Bravo: Demolition of the three (3) existing hangars (i.e. T1, T2 and Bravo Hangars).  Includes the removal of the existing bollards to grade level. Due to the depth of the bollard foundations the removal… Continue reading Signature Flight Hanger Demolition

Optimal Therapy Lake Mead

OWNER

Owner: Optimal Therapy Architect: Atwood Design Start Date: February 2023 Completion Date: May 2023 Project Description Perform demolition and tenant improvement at an existing one story office building.

RTC Hydrogen Fueling

OWNER

Owner: Regional Transportation Commission of Southern Nevada Architect: Clean Energy Start Date: September 2023 Completion Date: In Progress Project Description A complete mobile fueling system to support the operation of up to 15 hydrogen fuel cell electric buses at the Sunset Maintenance Facility (SMF). The mobile fueling system is intended to be used as an… Continue reading RTC Hydrogen Fueling