Additional Jobs
Freedom Meats
This 26,623 Square foot cold storage and office building was built on the same footprint as an existing building which ran without a loss of 1 productive day. The project complexity required 3 phases. During phase 1 the new facility is being built over the top of the original, which was demolished from inside the new. The project total exceeds $4.2M.
Solid State Electric Office Building
This is a 17,598 square feet commercial office/ warehouse building. The estimated budget for this project is $3M.
Nevada State College Student Services Building
Nevada State College procured a building with state funding which Monument built at a budget of 25% of new construction costs. The project area is 2.44 Acres. This is a fast-tracked project since it must be ready before the start of the next fall semester. The estimated budget for this project is currently $1.5M.
University of Nevada, Las Vegas – Lied Library
This is a Nevada Public Works division project. The project area is around 5,000 square feet and the current estimated budget for this project is $1M. This project works right in the heart of the university and being a library project, it has high end acoustical and soundproof elements in it. The demands and sophistication of owner/client coordination is top level and requires skills of a degreed candidate to match up to the knowledge of the architects and the clients. A formal 2–3 hour progress meeting every other Wednesday is one of their requirements which includes preparing meeting minutes.
Spring Mountain Youth Camp, Mount Charleston, Nevada
This youth detention facility includes 5 buildings and 30,000 square feet. Located 52 miles from Las Vegas at a mountain youth detention center, this project requires extra security measures, background checks and rigorous coordination. The estimated budget for this project is at $1M.
Well Care Pharmacy at Charleston
This pharmacy complex is being built in 2 phases – 3300 West Charleston and 3312 West Charleston. This project is spread over 13,000 square feet and its estimated budget is $2.5M