Additional Jobs

Freedom Meats

This 26,623 Square foot cold storage and office building was built on the same footprint as an existing building which ran without a loss of 1 productive day. The project complexity required 3 phases. During phase 1 the new facility is being built over the top of the original, which was demolished from inside the new. The project total exceeds $4.2M.

Solid State Electric Office Building

This is a 17,598 square feet commercial office/ warehouse building. The estimated budget for this project is $3M.

Nevada State College Student Services Building

Nevada State College procured a building with state funding which Monument built at a budget of 25% of new construction costs. The project area is 2.44 Acres. This is a fast-tracked project since it must be ready before the start of the next fall semester. The estimated budget for this project is currently $1.5M.

University of Nevada, Las Vegas – Lied Library

This is a Nevada Public Works division project. The project area is around 5,000 square feet and the current estimated budget for this project is $1M. This project works right in the heart of the university and being a library project, it has high end acoustical and soundproof elements in it. The demands and sophistication of owner/client coordination is top level and requires skills of a degreed candidate to match up to the knowledge of the architects and the clients. A formal 2–3 hour progress meeting every other Wednesday is one of their requirements which includes preparing meeting minutes.

Spring Mountain Youth Camp, Mount Charleston, Nevada

This youth detention facility includes 5 buildings and 30,000 square feet. Located 52 miles from Las Vegas at a mountain youth detention center, this project requires extra security measures, background checks and rigorous coordination. The estimated budget for this project is at $1M.

Well Care Pharmacy at Charleston

This pharmacy complex is being built in 2 phases – 3300 West Charleston and 3312 West Charleston. This project is spread over 13,000 square feet and its estimated budget is $2.5M

PAST PROJECTS

Spring Mountain Youth Camp: Fuel Line Remove and Replace

OWNER

Clark County Real Property Management

Sustainability Gallery Exhibit Acquisition

OWNER

Las Vegas Valley Water District

Pecos Bonanza Campus Family Court BLDG

OWNER

Clark County Real Property Management

Strong Start Academy

OWNER

The City of Las Vegas