Spring Mountain Youth Camp-Football Field Synthetic Turf Replacement
Owner:
Clark County Real Property Management
Architect:
RWA Architects
Start Date:
August 2023
Completion Date:
January 2024
Project Description
The work consists of the synthetic field turf replacement of an existing 80-yard football field and includes installation of erosion and sediment controls during construction, demolition and disposal of existing infilled synthetic turf and fill, approximately 64,100 square feet import and placement of permeable aggregate materials finish grading selective removal and replacement of mow curb, turf edge anchor, installation of under turf shock pad system, installation of infilled synthetic turf, new footings for the goal posts, lines and markings for football and new end zone goal posts, soccer striping to new field, school logo at center field, 2-yard deep out of bounds striping. Color turf end zones, retractable field goal net, wheeled soccer goals. Regrading of gravel entrance road.