Pecos Bonanza Campus, Zenoff Hall, Underground Sewer Replacement
Owner:
Clark County Real Property Management
Contact Phone:
(702) 455-4567
Contact Email:
Kenneth.ballard@clarkcountynv.gov
Architect:
Karl Pils
HPA Consulting Engineer
Start Date:
April 2020
Completion Date:
January 2021
Project Description
The work consists of replacement of the existing sewer and grease waste line within Zenoff Hall to termination to the nearest cleanouts. The scope removes and replaces, in entirety, the below slab sanitary sewer and grease waste sewer lines, along with new cleanouts and grease interceptor. A temporary kitchen facility will be required for the duration of construction. This facility (temporary kitchen trailer will be provided by Owner under separate contract, however at completion of the contract, the contractor is responsible to remove and safe-off temporary power, water, sewer, and propane connections for this facility
Project Evaluation:
$999,989.00