Ely Stake Center
Owner:
The Church of Jesus Christ of Latter-day Saints
Architect:
Kevin Reisch
Start Date:
November 2023
Completion Date:
January 2024
Project Description
Roof Replacement of Sheet Metal ower roof with Composition Shingle Assembly and Single Ply Assembly at overbuild area, repair of finishes and surfaces from water
damage from Feb 2023 damage to include replacement of drywall at ceilings and walls, insulation replacement, standing and running trim at damaged areas, and masonry re-pointing

