CCDOA ARACC POWER AND METER BOARDS FOR EV CHARGERS
Owner:
Clark County Department of Aviation
Architect:
TYLin Group
Start Date:
August 19, 2024
Completion Date:
August 25, 2025
Project Description
This project is located at Harry Reid International Airport and includes adding new utility electrical infrastructure to support six (6) tenant meter boards at several locations at the Airport Rent-A-Car Center (“ARACC”) for future charging of electric rental vehicles. The scope of this project is to provide the rental car companies with a direct point-of-connection to the power utility only. Includes trenching, backfill, asphalt replacement, concrete demo and replacement, bollards, striping & signing, on site and off site traffic control, NV Energy coordination and permitting.

