Signature Flight Hanger Demolition
Owner:
Signature Aviation
Architect:
PGAL
Start Date:
April 2023
Completion Date:
Project Description
Demolition – Existing T Hangars and Hangar Bravo: Demolition of the three (3) existing hangars (i.e. T1, T2 and Bravo Hangars). Includes the removal of the existing bollards to grade level. Due to the depth of the bollard foundations the removal would cause the existing sidewalk to be damaged, removal of the existing AOA fencing. Includes construction of eight (8) foot high temporary (AOA – Air Operations Area) fence based on 1,252 lineal feet. This fence includes Razor wire per DOA requirements in addition shall have furnished concrete F-Rail to be install on the land side, replacement of the eight (8) foot high permanent (AOA) fencing along the existing west side based on 665 lineal feet, includes the signage to be installed on the fence line to include nine (9) warning signs on the temporary DOA fence and thirteen (13) on the new fence. Asphalt patching, site utilities and electrical were included in the project.

